Bridge – Laura River South

By January 21, 2013NEWS & PICS

Maciilwain Civil – Laura River South Project

AIM manufactured, galvanized and delivered 184 tonne of steel for the Laura River South Bridge projects.

What was special about this project was the use of cambered welded beams to enable spans in excess of 30m to be achieved.  This was a unique project in that the beams were hot dipped galvanised. The ability to maintain the camber of the beam post galvanising was critical to the success of the project.

Aim were able to deliver to the remote Cape York location. Individual beams were in excess of 6 tonnes