BMD Albem Mulgrave River Crossing Upgrade

By November 20, 2010NEWS & PICS

AIM were engaged to supply the bridge rails for the 480m long Mulgrave river bridge. AIM managed to deliver the fabricated galvanised bridge rails ahead of schedule with no rework required.